All over but the buttonband
Last night I finished up the body and sleeves of Something Red. I was not ready thought to pick up the over 200 sts for the buttonband/collar. I guess I have learned from my "Starting things after 9pm and a drink" fiascos. I am not sure what is going on with the ribbing area turning back but hopefully the band will help with that.
Hubby's socks have been basically ignored thies week but I don't see him wearing them until the fall so I do have time.
We sign the Title papers on our house a week from today. That is the kick in the ass I needed to get packing. This weekend we are packing the kitchen, most clothes and what ever else we can go a week without. Yeah!
Labels: house, Something Red
2 Comments:
I'm impressed that your have basically finished the sweater and have too move in two weeks. When I had to pack for my big move I had no time whatsoever to knit. Good luck on the move. Looking forward to seeing the button band.
By Quail Hill Knits, at 6:37 PM
The cardigan looks great. I tried to work on mine this weekend but totally lost the necesssary "mojo". There were two mimosas involved so maybe that was it. Congrats on the house and good luck with the move!
By Anonymous, at 9:54 AM
Post a Comment
<< Home